The following are updates on current street work in the City of Watertown:

Posted 08/14/2018


Due to a quality assurance/quality control concern on Nelson Lane, Kathryn Court, and Wisconsin Street, these three streets will remain under construction for the next few weeks and will not be paved with the first batch of streets receiving asphalt paving in the City.  The City hopes to have this matter resolved within the coming weeks and to have these streets either completed or patched back before year’s end.  The City wants to thank you for your patience and understanding in this matter.

Posted 08/09/2018

Paving will be occuring the week of 08/13/2018 on the following streets, weather pending: Amber Lane; James Street; Milford Street; Silver Drive; Tlhoa Court; and West Street.

Posted 08/07/2018:

Visu-Sewer will be working in the City from this current week through 08/20/2018.  They are completing cured-in-place-pipelining.  Visu-Sewer will be contacting all affected residents directly prior to beginning work on the affected block.  To see the maps of the areas Visu-Sewer is planning on completing for the upcoming weeks, please click on the following links to see the maps.  

Week of 08/06 - 08/12/2018 (Inlcudes portions of Wilbur Street, W. Main Street, Sunnyfield Court, O'Conell Street, N. Washington Street, Silver Drive, Clay Street, W. Spaulding Street and Sand Street).

Week of 08/13 - 08/20/2018 (Includes portions of Milford Street, Pearl Street, William Street, Mary Street, Clark Street, Dakota Street, and Hart Street)

Posted 06/08/2018:

Seal coating will begin in the city on Wednesday, June 13, 2018, weather permitting. This process is completed on various road surfaces to extend the life of the paved surface by providing a protective layer from moisture, chemicals, and the sun. The project is expected to last approximately 1-2 weeks.  If there is inclement weather, the project could exceed that timeline. Should you have any questions or concerns, please contact Jay Haberkorn at the City of Watertown Engineering Department at 920-262-4047.  The list of streets is as follows:

Street Name: At: Towards: Length (ft): Width (ft): Rounded Area (SY)
Spaulding Street N. Water N. Second Street 1901 30 6350
N. Second Street (Termini) Prospect Street 1200 30 4000
Prospect Street Center Street 600 30 2000
Center Street North Avenue Carl Schurz Drive 1267 30 4225
Carl Schurz Drive E. Leonard Street 1109 30 3700
E. Leonard Street City Limits/Boulder 650 30 2175
W. Madison Street Depot Street S. Monroe Street 264 26 775
S. Monroe Street S. Church Street 1004 32 3575
Emmet Street S. Church Street Termini 1532 28 4775
S. Montgomery Street W. Main Street Emmet Street 370 36 1500
Emmet Street Lafayette Street 792 34 3000
Arthur Street N. Fourth Street Cleveland St 300 25 850
Lincoln Street N. Fourth Street Garfield St 650 25 1800
Hancock Street N. Fourth Street E. Division St 900 25 2500
Garfield Street E. Division Stret  Termini 700 24 1900
Cady Street N. Church Street N. Second St 1350 32 4800
Kimberly Court N. Fourth Street Termini 450 32 1600
Schuman Drive N. Fourth Street Termini 2550 30 8500
Wedgewood Dr Schuman Drive Coventry Dr 600 32 2150
Wedgewood Ct Wedgewood Drive  Termini 95 84 900
Stoneridge Dr Schuman Drive Meadowbrook Dr  400 32 1450

Posted 06/04/2018:

*Water main work is beginning this week at the following locations:
James Street
Amber Lane
Tloha Court
Nelson Lane
Kathryn Court
Wisconsin Street

*Sanitary sewer work is beginning on Dakota Street.

*Storm sewer work is beginning on Sand Street & Silver Drive.

*The Carriage Hill shared used path is in progress.

*The crackfilling contractors will begin their work this week. This will include the following streets:

Street Name:

At:

Towards:

Length (ft):

Width (ft):

Rounded Area:

Spaulding Street

N. Water

N. Second Street

1901

30

6350 SY

 

N. Second Street (Termini)

Prospect Street

1200

30

4000 SY

 

Prospect Street

Center Street

600

30

2000 SY

 

Center Street

North Avenue

Carl Schurz Drive

1267

30

4225 SY

 

Carl Schurz Drive

E. Leonard Street

1109

30

3700 SY

 

E. Leonard Street

City Limits/Boulder

650

30

2175 SY

 

Western Avenue

S. Twelfth Street

Harvey Avenue

950

34

3600 SY

 

Harvey Avenue

S. Concord Avenue

634

28

1975 SY

 

Boomer Street

River Drive

S. Twelfth Street

4066

32

14475 SY

 

Richards Avenue

Sunset Avenue

Concord Ave

1850

32

6600 SY

 

Harvey Avenue

Western Avenue

Thomas Avenue

686

31

2375 SY

 

W. Madison Street

Depot Street

S. Monroe Street

264

26

775 SY

 

S. Monroe Street

S. Church Street

1004

32

3575 SY

 

Emmet Street

S. Church Street

Termini

1532

28

4775 SY

 

S. Montgomery Street

W. Main Street

Emmet Street

370

36

1500 SY

 

Emmet Street

Lafayette Street

792

34

3000 SY

 

Air Park Drive Shared-use Path

S. Church Street

S. Twelfth Street

5,600

10

6,250 SY

 

This information will be updated as construction progresses.  All schedules may change due to weather delays or contractor availability. 

The Watertown Street Department works 4-day work weeks in the summer months.  City construction crews do not work Fridays.

If you have any questions, please feel free to contact the Street Department at (920) 262-4080 or the Engineering Department at (920) 262-4047.

Storm sewer installation    Sidewalk Replacement